click to enlarge
2023 Eagle River, AK
Role: Project Supervisor
14,000’ of brushing and debris disposal, 55 funnel and sump drains, 2667’ of barricaded and rehabilitated trail, 562’ of re-routed trail, 1026’ of existing tread improvement, 1230’ of plank walk and steps.
Coordinated all logistics for the helicopter operation including load breakdowns, load rigging, determining all drop zones, and leading communications for the four days of operations.