2021 Alexandria, NH
Role: Project Supervisor
This was a full replacement of a 30 foot wood bridge roughly 2 miles in on the Holt/Manning trail. We worked with NH Fish and Game to bring the stringers in via UTV and a specialized cargo trailer. I supervised the setup and organization of materials in addition to setting up the rigging to get the stringers across the stream once the old bridge was removed.