click to enlarge
2025 Whittier, AK
Role: Crew Member
This project included building a 100 foot lateral drain with two french drains. Hardened tread alongside lateral drain by building a rock causeway from rock nearby the work site. Filled causeway with crush and D1 from supersacks along the trail.