2025 Whittier, AK
Role: Project Supervisor
Constructed ~300' of 24" wide step and run on a new benchcut alignment in order to abandon an old, rotten fall-line check step route.
Removed old trail structure and re-benched and filled 30’ of tread w/ D1 from nearby supersacks. Dug a dip drain.
Dug a large 100’ lateral drain w/ two french drains. Hardened tread alongside lateral drain by building a rock causeway from rock nearby the work site. Filled causeway with crush and D1 from supersacks along the trail.