click to enlarge
2024 Campbell Tract, Anchorage, AK
Role: Technical Rep.
Assessed a corridor for new trail construction. Used the established loose corridor flagging to tight flag the new trail alignment (1.5 miles). Directed a hand crew of 5 to benchcut the switchback legs, build two 36" wide x 16' long timber-sawn puncheons, and hand tune after the traildozer.